Location: Bilinga, QLD
Products: Stormceptor, Stormchamber, Hydrosystem and Stormsacks
The Project
SPEL assisted with the design and supply of a full storm water quantity and quality solution for the Southern Cross University at the Gold Coast Airport, Coolangatta. This entire stormwater treatment train system was installed underneath the University car park, to allow full utilisation of all available land in view of maximising the number of available car parking spaces.